Print View Posted on: 05 April 2012
Fire extinguished at Penly NPP.ASN will carry out an inspection on Friday 6 April 2012.On 5 April 2012, at around 12 midday local time, ASN was informed by the operator EDF that a fire had started in the n°2 reactor building of the Penly NPP (North-West of France). The reactor automatically shut down.EDF teams and the local firemen brigades entered the reactor building and extinguished small quantities of burning oil. The firemen ensured the fire was totally extinguished.The reactor is now shut down.This event will be officially reported by EDF.The ASN regional office located in Caen will perform an inspection at Penly NPP on Friday 6 April 2012.